Bahria Town Phase 4, Islamabad
60 kW on-grid system for The Arena cinema
Solar on the cinema roof carries the afternoon cooling while the halls get ready for the evening shows.
- Solar
- 60.32 kW
- Monthly bill
before Rs 22.5 lakhnow Rs 19.5 lakh
Industrial · Sargodha Road, Faisalabad · 2025
The day shift now runs largely on solar, on a three-phase industrial connection.
A weaving and finishing unit running a long day shift on an industrial connection, with a monthly bill of about Rs 39 lakh.
The warehouse roofs are corrugated steel, so we used clamp rails that fix to the roof sheet without drilling through it, with walkways between the rows for cleaning. Eight 50 kW inverters, surge protection on every string and a monitoring screen in the office complete the plant.
At 400 kW the system needed NEPRA approval and a load-flow study of the grid nearby, which we prepared and followed up. Because the machines run while the sun is up, the unit uses nearly all of the power itself.
They came back three times to check our roofs and our load before giving a price. The plant has done what they said it would.
Bahria Town Phase 4, Islamabad
Solar on the cinema roof carries the afternoon cooling while the halls get ready for the evening shows.
DHA Phase 2, Islamabad
A large family home that keeps its ACs running through the evening and through load shedding.
Rawalpindi
Operating theatres, the ICU and the data room switch to the battery in an outage, with the generator as the last line.